A new campus is being built in Ashburn, VA. It’s the future home of the Loudoun School for the Gifted.
Getting ready to pour the concrete slab floor.
Stair towers are in and structural steel is being erected.
Concrete slab floor has been poured. Meanwhile, bar joists are being installed and are resting on ICF walls (insulated concrete forms).
First-floor bar joists are going in!